Torpedo 7

Client: Torpedo 7
BCD Personnel: Lambertus Brandsma, Blair Currie, Alastair Waller
Start Date: September 2011 (Fixed Term Contract)
Completion Date: June 2013


The Challenge

BCD Group Ltd provided the Structural Engineering, Civil Engineering and Planning services, as part of a Design Build project team with Foster Construction Ltd, for the new Torpedo 7 Distribution Centre.

This 14,000m2 bulk storage and distribution centre provided the challenge of centralising our clients existing operation from 5 warehouses into one.

The Result

Designed and built on time and within budget.